Ride Site Readiness Checklist
Use this checklist before setting an installation date for an amusement ride in Nigeria. Start with a measured plan and the latest layout for the shortlisted model. Ask the ride supplier and your site engineers to review the same drawings so the quotation, construction plan and delivery route refer to the same configuration.
Official sources checked on 18 November 2026.
Before you select the model
- Draw the area you can use. Mark the boundaries, dimensions, levels, slopes, columns, overhead obstructions and neighbouring attractions. Include the survey date and drawing revision. For an indoor venue, record clear height below beams, ductwork and lighting along the delivery route and over the ride area.
- Add the operating areas. Mark likely queue, entry, exit and maintenance routes, plus staff and emergency access. For a park train, draw the entire intended route, boarding stops and points where pedestrians or vehicles cross. For a flying chair ride, ask the supplier to mark the full swept area, meaning the space used by moving seats during operation.
- Identify known site constraints. Record underground services, areas where water collects, sections affected by seasonal rain and any proposed work nearby. Flag uncertain items in the plan so the project team can verify them during its survey and model review.
Before releasing civil or electrical work
Ask for a layout that identifies the model, variant, revision and equipment interfaces. Have the supplier and your appointed engineers resolve any mismatch between that layout and the site survey. Confirm who issues the documents for each discipline and who will sign off on completed work.
| Review item | What to put in the site pack | Who should confirm it |
|---|---|---|
| Foundations or supporting floor | Survey and site conditions, ride loads and anchorage information, foundation or floor design, and required inspection or test records | Supplier provides model interfaces. Civil or structural engineer verifies site conditions and signs off the site design. |
| Levels and drainage | Existing and proposed levels, the planned drainage route, and any areas of ponding around foundations, queues or access paths | Site engineer reviews the levels and drainage against the final ride layout and operating conditions. |
| Permanent power | Available supply, phase, voltage, frequency, planned protection, earthing, isolator position and any standby arrangements | Supplier provides model-specific electrical requirements and identifies start-up loads where applicable. Electrical engineer confirms the site design and supply. |
| Temporary power | Source, capacity and location proposed for installation and testing, with the date it will be available | Installer states demand and intended use. Electrical contractor confirms the temporary arrangement and checks before use. |
| Public and service access | Queue and exit layout, emergency routes, fencing interfaces, service gates and access for maintenance | Operator and site team review day-to-day circulation. The appropriate design and inspection parties verify project requirements. |
For an indoor project, give the structural engineer the equipment loads and the planned movement and unloading routes, including any proposed staging area. For an outdoor project, ask the project engineer to use local site information for drainage and exposure conditions. Ask your electrical engineer to confirm the inspection and certification steps that apply to the installation and record the responsible parties in the project programme. NEMSA Technical Inspectorate Services.
Before dispatch and installation
- Walk the full delivery route. Start at the vehicle access point and follow the proposed route to the installation area. Mark narrow turns, doors, overhead restrictions, gradients and load-limited surfaces. Obtain packed dimensions, weights and any handling requirements from the supplier before confirming the route.
- Plan unloading and staging. Confirm the vehicle position, ground conditions, staging space and the route for moving components. Have the appointed lifting team review equipment needs and any weather limitations before booking the work. Name the person who will confirm the route is clear on arrival day.
- Review as-built conditions. Check completed levels, foundation or floor interfaces, anchorage and electrical readiness against the agreed drawing revisions. Record the accepted evidence and close any differences with the relevant engineer and ride supplier before the affected work proceeds.
- Coordinate the installation window. Put delivery, site access, local contractors, installation supervision, test availability and inspection appointments in one schedule. Record who is responsible for each item and who can confirm site readiness before dispatch.
Before handover and opening
Agree the commissioning checks, acceptance records and approval sequence for the selected ride before the installation crew mobilises. Assign each remaining item to an owner with a due date. The handover pack should identify the installed model and configuration and include the applicable operating and maintenance documents, training records, inspection and commissioning evidence, and the process for reporting faults or requesting parts. Set the opening date around the checks and approvals agreed for your project.
What to send with your enquiry
- Project city and state, venue type, site contact and target opening.
- Dated plan with available area, clear heights, levels and photos of the proposed ride area.
- Preferred ride type or model, number of units and intended visitors.
- Delivery route, gates or doors, unloading area and known access restrictions.
- Foundation, floor and utility information available to date, with the person responsible for any further checks.
- Installation scope you want quoted and any outstanding drawings or site decisions.
Ask the project team to confirm the required engineering documents, applicable standards and their editions for the chosen equipment. ASTM International publishes a ride-design practice that describes its scope and exclusions. ASTM F2291 overview.
See delivery and installation for the responsibilities to discuss before the first shipment, or send your site information for a project quote.